• Home
    • Uncategorized
    • $400 Million Redondo Beach Waterfront Project Fate: To Be Determined…

    $400 Million Redondo Beach Waterfront Project Fate: To Be Determined…

    As seen in the Daily Breeze Online“Like development wars of years past, the battle over Measure C in Redondo Beach has touched a nerve in the beach town and exposed deep divisions over what should be done with its aging waterfront. On Tuesday, Redondo Beach voters once again will be asked to pick sides. If they approve the contentious ballot measure, plans for an ambitious $400 million makeover of the waterfront could be derailed.”

    Redondo Beach Proposal

    Read full article from Daily Breeze below:

    http://www.dailybreeze.com/government-and-politics/20170304/measure-c-to-determine-fate-of-400-million-redondo-beach-waterfront-makeover

    Trackback from your site.

    Leave a Reply