
Description
Retail spaces available for lease at the multi tenant Green Tree Plaza. In-line suite 13728 #4 & 5 (2,721 sf). End cap Suite 13718-1 (+/-1,733 sf). End Cap 13728 #1 (1700 sf). Asking rent $1.10/psf + NNN (0.35 psf). Great location. Signalized intersection: Green Tree Blvd. and Hesperia Road. Street visibility. High traffic count and is expected to increase substantially in 2020 due the extension of Green Tree Blvd. over the Railroad tracks to Yucca Loma Road. The Shopping Center is being renovated and re-positioned. The Extension of Green Tree Blvd. from Hesperia Road to Ridgecrest Road would create the 5th east-west street that crosses the railroad tracks. The Yucca Loma Road portion of this corridor has been completed from Apple Valley Road (A) to Ridgecrest Road at a cost of $60 million include a bridge across the Mojave River. The Extension of Green Tree from Hesperia Road (C) to Ridgecrest Road scheduled to complete in 2020. This will cost $40 million and will involve the construction of a bridge over the railroad tracks.
-
0BEDS
-
3.32ACRES
-
0BATHS
-
01/2 BATHS
School Ratings & Info
Description
Retail spaces available for lease at the multi tenant Green Tree Plaza. In-line suite 13728 #4 & 5 (2,721 sf). End cap Suite 13718-1 (+/-1,733 sf). End Cap 13728 #1 (1700 sf). Asking rent $1.10/psf + NNN (0.35 psf). Great location. Signalized intersection: Green Tree Blvd. and Hesperia Road. Street visibility. High traffic count and is expected to increase substantially in 2020 due the extension of Green Tree Blvd. over the Railroad tracks to Yucca Loma Road. The Shopping Center is being renovated and re-positioned. The Extension of Green Tree Blvd. from Hesperia Road to Ridgecrest Road would create the 5th east-west street that crosses the railroad tracks. The Yucca Loma Road portion of this corridor has been completed from Apple Valley Road (A) to Ridgecrest Road at a cost of $60 million include a bridge across the Mojave River. The Extension of Green Tree from Hesperia Road (C) to Ridgecrest Road scheduled to complete in 2020. This will cost $40 million and will involve the construction of a bridge over the railroad tracks.
Based on information from California Regional Multiple Listing Service, Inc. as of 2023-03-22T17:31:43.743. This information is for your personal, non-commercial use and may not be used for any purpose other than to identify prospective properties you may be interested in purchasing. Display of MLS data is deemed reliable but is not guaranteed accurate by the MLS or Beach City Brokers | BCB Premier Estates | The Miller Group. Licensed in the State of California, USA.